LoQerja.com - Cirebon Power adalah konsorsium multi-nasional yang memiliki Pembangkit Listrik Supercritical dengan kapasitas 1x660 MW di pesisir kabupaten Cirebon. Saat ini membutuhkan tenaga kerja untuk menempati posisi sebagai:
1.OPERATION
2.MAINTENACE
3.PROJECT
- Plant Operation Shift Supervisor
- Coal Operation Shift Leader
- Coal Operation CR Supervisor
2.MAINTENACE
- Boiler Engineer
- Electrical Supervisor
- Coal Leader
- Coal Handling Facility Engineer
3.PROJECT
Construction and Commissioning (Contract Base)
4.SUPPORT
General Requirements :
- Electrical Engineer
- Turbine Engineer
- Document Control
4.SUPPORT
- IT Application Specialist
- Asset Management Specialist
General Requirements :
- Min. 7 years of experience in Coal Fired Power Plant (CFPP) with 5 years in related field for Leader positions.
- Min. 6 years of experience in related field in CFPP for Engineer / Specialist positions.
- Min. 3 years of experience in related field in CFPP for Supervisor positions.
- Experience in large capacity CFPP (above 660 MW) with Super Critical Boiler will be an advantage.
- Bachelor degree in Mechanical or Electrical Engineering and related field of study is more preferable.
- Will be involved in pre-commissioning activities and pre COD planning and preparation, for Operation and Maintenance positions.
- Willing to work in shift schedules for Operation positions.
- Willing to work in Cirebon.
Cara Mengirim Lamaran
Jika anda memiliki kualifikasi diatas, Kirimkan CV dan Lamaran anda ke
Send your Latest CV in English (max 1MB) with subject of related position eg. C2 Coal Operation Shift Leader not later than 1 December 2020 to recruitment@cirebonpower.co.id
Post a Comment